Spot meeting of fully automatic metro system for Shanghai Line 10

 
 

On May 17th 2019, it is the fifth anniversary for the operation of fully automatic metro system of Shanghai Line 10. Organized by China Urban Rail Transit Association and co-organized by Shanghai Shentong Metro Group, the "Spot meeting on fully automatic operation system of Shanghai Line 10" was held at Hongqiao area in Shanghai,the representative of relevant metro construction units and operating enterprises were present.

Shanghai metro line 10 is the first metro line in China, which is designed according to the automation level of GoA4. Since August 9th, 2014, the fully automatic driverless operation mode has been officially put into service. The operation condition is good, the system is safe and reliable, and the operation efficiency and operation reliability are always maintained at a high level. It is further proved that GoA4 meets the needs of safe operation of large passenger flow of urban rail transit in China,which has produced the good demonstration effect in China.

As the general consultant of automatic metro system for Shanghai Line 10, SYSTRA was also invited to attend this meeting to exchange experience on automatic driverless metro and to visit the OCC in the depot of the line together with related representatives coming from Shentong Metro and the Association. With successful consulting services on automatic driverless system of Shanghai Line 10 and on APM system of Shanghai Pujiang line, as well as the international experience accumulated in the new and renovation projects with fully automatic metro system,SYSTRA is confident that we have the strong capability to provide high-quality design consulting services to more domestic partners in the field of rail transit, covering the whole life cycle of the projects.

Back